Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 07/30/2005 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) UNIT C GAS PRESSURE TEST IS OK FROM METER ALL THE WAY TO APPLIANCES 2) UNIT A OK BY BOB RICH INSIDE OF UNIT TO STUBB OUT OF UNIT 3) UNIT B GAS PRESSURE TEST FROM APPLIANCES TO STUBB OUT OF BLDG IS OK ONLY 4) UNIT D GAS PRESSURE TEST IS OK FROM APPLIANCES TO STUBB INTO STORAGE ROOM ONLY |
|
| 07/27/2005 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) UNIT A-20 PSI TEST INTERIOR TO STUB OUT AT BLDG ONLY OK. NEED TO SEE TEST ON ENTIRE SYSTEM 2) UNIT B, C, D SHALL HOLD MINIMUM 10 PSI FOR 15 MINUTES. UNIT D PIPING CANNOT RUN UNDERGROUND UNDER BLDG OR STRUCTURE. ALL GAS SYSTEMS WILL REQUIRE TEST IN ENTIRETY |
|
| 07/26/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DWV WATER TEST IS OK 2) TUB AND SHOWER DIVERTERS OK 3) WATER DISTRIBUTION IS OK 4) GAS PRESSURE TEST WAS AT 0 POUNDS |