Inspection Status: Approved

Inspection History: PLUMBING - SEWER HCS CONNECT

Date Description Inspector Results Comments
12/17/2007 PLUMBING - SEWER HCS CONNECT Approved IVRS - Inspection :*
11/22/2006 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection :*
09/27/2006 PLUMBING - SEWER HCS CONNECT Denied IVRS - Inspection :
See detailed listing on site.| 999*
- YOU HAVE BACKPITCH IN AT LEAST 2 AREAS.
- YOUR SITE UTILITY PLAN DOES NOT HAVE PLUMBING PLANS EXAMINER STAMP.
- YOUR FOUNDATIONS PLAN DOES AND IT CALL FOR A TWO WAY C/O TO BE INSTALLED, THIS IS REQUIRED BY CODE TO SERVE THE SECTION OF 4" BUILDING DRAIN, AS YOUR UPPER TERMINAL COS ARE ONLY 3".
ALSO, CALL FOR BOTH ADDRESSES.
09/19/2006 PLUMBING - SEWER HCS CONNECT Denied IVRS - Inspection :
See detailed listing on site.| 999*
NOT ALL SITE SEWER IS EXISTING.
PROVIDE SITE UTILITY PLAN SHOWING THAT TWO SEPARATE BUILDINGS W/DIFFERENT ADDRESSES TIE INTO A COMMON SEWER.
A JOINT SEWER AGREEMENT IS ALSO NECESSARY.
INSTALL EXTERIOR SEWER CLEANOUTS
INSTALL TRACER WIRE