Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2006 | ENGINEERING - FINAL | Approved | ||
| 02/24/2006 | ENGINEERING - FINAL | Partial Approval | 1) C OF O APPROVAL NOT TO BE GIVEN UNTIL ALL CONSTRUCTION WORK IS COMPLETED AND A FINAL GRADING INSPECTION FOR PERMIT # t03BU02987 IS COMPLETED AND APPROVED. 2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD ON THE RET/DET BASIN. 3) STABILIZE THE WEST BANK OF THE BASIN. 4) SEPARATE CONST. ACTIVITIES FROM OCCUPIED SIDE OF BLDG. |
|
| 02/23/2006 | ENGINEERING - FINAL | Partial Approval | TEMP C/O FOR ENG APP. PERMANENT C/O NOT TO BE GIVEN UNTIL ALL CONSTR WORK IS COMPLETED | |
| 02/21/2006 | ENGINEERING - FINAL | Denied | 1) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE RET/DET BASIN ON SITE WAS BUILT IN ACCORDANCE WITH THE APPROVED SITE PLAN. 2) CLEAN OUT MATERIAL FROM RET/DET BASIN (PAINT, STUCCO, CONCRETE ...) AND STABILIZE WEST SLOPE OF BASIN. 3) CLEAN UP CONSTRUCTION DEBRIS AND MATERIAL. |