Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2007 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/25/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TC CABLE TO BE INSTALLED IN CABLE TRAY OR RACEWAY PER NEC 336 2. DO NOT SEE LISTING MARK ON PAINT BOOTH 3. NEED TO INSTALL GROUNDING ELECTRODES AT SEPARATE STRUCTURE PER NEC 250.32 4. BOND STEEL BUILDING TO PANEL SERVING SPRAY BOOTH PER NEC 250.104 5. BOND SPRINKLER PIPING TO PANEL PER NEC 250.104 6. HIGH LEG TO BE TERMINATED ON B PHASE PER NEC 408.3 7. SEAL OPEN KNOCKOUTS IN CONTROL PANEL. 8. LUGS IN JUNCTION BOX NOT LISTED FOR MULTIPLE WIRE TERMINATIONS. 9. 8"X8" JUNCTION BOX NOT SIZED PROPERLY PER NEC 314.28 BOX NEEDS TO BE PROPERLY SECURED. |