Permit: T05CM02154

Parcel: 11202034A


Addresses:

3838 N CAMPBELL AV


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T05CM02154

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
01/12/2006 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*6" ABS BLDG CONNECT TO 6" SDR 35 W/MISSION C??. OK TO COVER
12/04/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*AIR PRESSURE TEST I SOK
THIS INSPECTION IS FOR THE REMAINDER OF ROUGH PLBG. BETWEEN GRID # 11 THEN 13 ONLY.
HCS CONNECTIONS OF BLDG DRAINS TO BLDG SEWER IS OK.
OK TO BACKFILL THE TRENCH.
11/17/2005 PLUMBING - ROUGH, SOIL Partial Approval BLDG DRAIN CONNECTIONS TO SITE SEWER AT FOUR PLACES AS HIGHLIGHTED ON PLAN OK TO COVER
PLEASE PROVIDE INSPECTION HISTORY ON PRIVATE SEWER- AND PDEQ STAMP CERTIFICATE TO CONSTRUCT
11/12/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*WRAPING OF ALL DWV RISERS AND FLOOR DRAINS ARE OK
11/07/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*AIR PRESSURE TEST IS OK FOR DWV SYSTEM
THIS INSPECTION IS FOR UNDERGROUND PLUMBING SYSTEM BETWEEN GRID LINE #11 THEN 13 ONLY AS INITIATED ON PLAN
AIR PRESSURE TEST FOR 4" C.W SUPPLY IS OK
11/01/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) PIPE WRAPS 1-1C ? LINES OK AREA C
10/21/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*AIR PRESSURE TEST IS OK
NOTE: THIS INSPECTION IS FOR THE RELOCATION OF 4" BLDG DRAIN AND ADDED SK-5 SINK AS PER RED LINES ON APPROVED DRAWINGS.
OK TO BACKFILL THE TRENCH.
10/18/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*AIR PRESSURE TEST FOR RWC IS OK AS NOTED ON PLAN BETWEEN GRID LINE #6 & 7 AND #9 & 10
OK TO BACKFILL THE TRENCH.
10/17/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*ABS DWV UNDER GROUND BETWEEN COLUMNS # 7 & 9 AS HIGHLIGHTED ON PLAN OK TO COVER
10/13/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*AIR PRESSURE TEST IS OK
THIS INSPECTION IS FOR UNDERGROUND PLBG. BETWEEN GRID LINE # 4 & 6 IS OK
OK TO BACKFILL THE TRENCH.
10/11/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*C.O HAS BEEN INSTALLED @ NORTH BLDG.OK TO BACKFILL TRENCH
6" R WL BETWEEN GRID LINE # 3 & 4 STUBBED OUT TO TWO WAY C.O IS OK
OK TO BACKFILL THIS TRENCH
10/07/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*AIR PRESSURE TEST IS OK
UNDERGROUND ROUGH PLBG. IS OK FOR THE NORTH BLDG EXCEPT FOR THE CONTINUATION OF 4" BLDG DRAIN BETWEEEN GRID LINE C AND A TOWARDS THE STAIR WELL AS NOTED ON PLAN.
SHALL PROVIDE A C.O WHERE HORIZONTAL BLDG. DRAIN EXCEEDS 135 DEGREE IN RM # 1621
SHALL REQUIRE A LETTER FROM ENGINEER WITH HIS OR HERS SEAL STATING THAT ABS SCH 40 MATERIAL IS ACCEPTED IN LIEU OF SERVICE WEIGHT CAST IRON
OK TO BACKFILL TRENCH UP TO C.O LOCATION IN RM# 1621