Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM02154
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*6" ABS BLDG CONNECT TO 6" SDR 35 W/MISSION C??. OK TO COVER | |
12/04/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*AIR PRESSURE TEST I SOK THIS INSPECTION IS FOR THE REMAINDER OF ROUGH PLBG. BETWEEN GRID # 11 THEN 13 ONLY. HCS CONNECTIONS OF BLDG DRAINS TO BLDG SEWER IS OK. OK TO BACKFILL THE TRENCH. |
|
11/17/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | BLDG DRAIN CONNECTIONS TO SITE SEWER AT FOUR PLACES AS HIGHLIGHTED ON PLAN OK TO COVER PLEASE PROVIDE INSPECTION HISTORY ON PRIVATE SEWER- AND PDEQ STAMP CERTIFICATE TO CONSTRUCT |
|
11/12/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*WRAPING OF ALL DWV RISERS AND FLOOR DRAINS ARE OK | |
11/07/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*AIR PRESSURE TEST IS OK FOR DWV SYSTEM THIS INSPECTION IS FOR UNDERGROUND PLUMBING SYSTEM BETWEEN GRID LINE #11 THEN 13 ONLY AS INITIATED ON PLAN AIR PRESSURE TEST FOR 4" C.W SUPPLY IS OK |
|
11/01/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PIPE WRAPS 1-1C ? LINES OK AREA C |
|
10/21/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*AIR PRESSURE TEST IS OK NOTE: THIS INSPECTION IS FOR THE RELOCATION OF 4" BLDG DRAIN AND ADDED SK-5 SINK AS PER RED LINES ON APPROVED DRAWINGS. OK TO BACKFILL THE TRENCH. |
|
10/18/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*AIR PRESSURE TEST FOR RWC IS OK AS NOTED ON PLAN BETWEEN GRID LINE #6 & 7 AND #9 & 10 OK TO BACKFILL THE TRENCH. |
|
10/17/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*ABS DWV UNDER GROUND BETWEEN COLUMNS # 7 & 9 AS HIGHLIGHTED ON PLAN OK TO COVER | |
10/13/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*AIR PRESSURE TEST IS OK THIS INSPECTION IS FOR UNDERGROUND PLBG. BETWEEN GRID LINE # 4 & 6 IS OK OK TO BACKFILL THE TRENCH. |
|
10/11/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*C.O HAS BEEN INSTALLED @ NORTH BLDG.OK TO BACKFILL TRENCH 6" R WL BETWEEN GRID LINE # 3 & 4 STUBBED OUT TO TWO WAY C.O IS OK OK TO BACKFILL THIS TRENCH |
|
10/07/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*AIR PRESSURE TEST IS OK UNDERGROUND ROUGH PLBG. IS OK FOR THE NORTH BLDG EXCEPT FOR THE CONTINUATION OF 4" BLDG DRAIN BETWEEEN GRID LINE C AND A TOWARDS THE STAIR WELL AS NOTED ON PLAN. SHALL PROVIDE A C.O WHERE HORIZONTAL BLDG. DRAIN EXCEEDS 135 DEGREE IN RM # 1621 SHALL REQUIRE A LETTER FROM ENGINEER WITH HIS OR HERS SEAL STATING THAT ABS SCH 40 MATERIAL IS ACCEPTED IN LIEU OF SERVICE WEIGHT CAST IRON OK TO BACKFILL TRENCH UP TO C.O LOCATION IN RM# 1621 |