Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2005 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 11/02/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection Rear P-1 shear panel not nailed per plan Third failure-refee |
|
| 11/01/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SOUTH P-1 SHEAR NOT NAILED PER PLAN |
|
| 10/25/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 3/8" OSB SHEAR PANELS MUST BE INSTALLED WITH LONG DIMENTION ACCROSS STUDS PER 2000 IRC TABLE 602.3 (3) NOT B 2) GABLE END STUDS NOT CLIPPED PER 1/SD3 3) 7/SD3 NOT COMPLIED WITH WEST GABLE 4) SOUTH P-1 SHEAR NOT NAILED |