Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/17/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE MAKE CORRECTIONS LISTED ON PAST INSPECTIONS. |
|
| 04/13/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. FINISH INSTALL OF WATER IN PHARMACY. 2. SEE NOTE #1 FROM 3/28/06 INSPECTION. |
|
| 03/28/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NO PROBLEM FOR TEMP C OF O FOR STOCKING. 1. NEED ALL FIXTURES INSTALLED AND TAPED CLEANOUT PLUGS & COVERS WHERE REQUIRED. |
|
| 03/24/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NOT READY 1:40 PM PAUL (AM) - (602) 750-2265 ADDRESS NOT POSTED. SUPER NOT ON SITE. OPEN DRAIN PIPES IN PHOTO AREAS. CLEAN OUT NOT PLUGGED AT FLOOR SINK. WALK IN COOLERS NOT INSTALLED. MOP SINK ROOM LOCKED. PROPER USE OF CLEAN OUT PLUGS REQUIRED. THIS MAY NOT BE A COMPLETE LIST. BATHROOM FIXTURES ARE SET. |