Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/12/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* PROVIDE FUNCTIONAL GAS TEST GAUGE |
|
| 06/06/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* FROM METER GAS DISTRIBUTION 60 PSI TEST TO STUBS ON ROOF. 1. SHALL SEE CONTINUATION OF ALL PIPING WITH TEST TO APPROVED VALVES AT ALL LOCATIONS 2. ROOF JACKS ARE REQUIRED AT ALL GAS PENETRATIONS THRU ROOF. 3. GAS PIPING TO RH-1 & RH-2 TO BE PER APPROVED GAS ISOMETRIC. |