Permit: T05CM02056

Parcel: 12814136A


Addresses:

5163 E 22ND ST

Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Date Description Inspector Results Comments
06/11/2008 ELECTRIC - UNDERGROUND Approved IVRS - Inspection :*
05/27/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK 12 POLE BASES
05/16/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK U.G FOR SIGNS AND POLE LIGHTS AT FRONT OF LOT ALONG 22ND ST
05/12/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK U.G TO 6 POLE LIGHTS CONTINUATION OF WEST LOT
04/01/2008 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1. OK U.G TO 6 POLE BASES WEST LOT
2. OK 6 POLE BASES WEST LOT
3. OK U.G FROM NEW BUILDING OUT TO WEST LOT
4. OK U.G UP TO EXISTING LOT AT FRONT FOR SIGN AND POLE LIGHTS
09/05/2007 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1. OK (3) 1" PVC FROM LIGHTING PANEL TO ISLAND IN
PARKING LOT
2. OK (1) 3/4" PVC FROM ISLAND FOR POLE LIGHTS
3. RECALL FOR POLE BOXES.
01/18/2007 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK 3-4" PVC FEEDERS BLDG TO TEP TRANSFORMER
12/05/2006 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
ALL BRANCH CIRCUITS BETWEEN ELECTRICAL ROOM TO REDLINE A -- NORTHERN WALL AREA, ALL CONDUITS OK TO COVER.
11/21/2006 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
SERVICE LIFT FEEDS RECEPTS 3/4"
PARTIAL ELEC. WATER HEATER CIRCUITS.
11/07/2006 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
UFER, STEEL & SPRINKLER BOND
11/01/2006 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
OK UG UP TO GRID LINE 6.75 AS DISCUSSED WITH GILBERT ELECTRIC
10/20/2006 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
3 -- 3/4" OFFICE
2 -- 1 3/4 AT ELEVATOR EQUIP. ROOM
1 - 1"

ALSO, SUB. ELEC. ROOM PARTIAL OK TO COVER AS DISCUSSED.
10/10/2006 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
CODE INFORMATION DISCUSSED