Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2007 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* SERVICE BAY - LINES A TO L SLOPE OF 1" OK TO POUR |
|
| 08/09/2007 | BUILDING PRE-SLAB | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/30/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* NE SERVICE AREA |
|
| 07/16/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* NORTH SIDE - GRID A TO H SOUTHSIDE COMPLETE -- OK TO POUR |
|
| 03/30/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* DRIVE THRU SERVICE BAY OK TO POUR |
|
| 03/29/2007 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection :* 1. DOWELS @ GRIDLINE "M" MUST BE BENT INTO ON GRADE SLAB BEFORE POUR AS PER DETAIL #5 ON SHEET S3.1 2. NO KEY AT GRIDLINE "L" COLD JOINT. MUST DOWEL WITH 1/E" SMOOTH ROD @ 2 FOOT O.C W/12" EMBEDDEMENT @ CONST. JOINT AS PER DETAIL 3 ON SHEET #S1.2 |
|
| 03/16/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* SECOND FLOOR MEZZANINE - WELDED WIRE MESH |
|
| 02/17/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* DRY PACK AT STEEL COLUMNS OK |
|
| 01/26/2007 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* PRE-SLAB AT GRID LINES #7 & #8 FROM B TO L OK TO POUR |
|
| 01/25/2007 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection :* | |
| 11/28/2006 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* SQUARED FROM COLUMN LINE C TO L AND #1 TO #6 (SHOWROOM PARTS & OFFICES) |