Permit: T05CM02056

Parcel: 12814136A


Addresses:

5163 E 22ND ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
10/14/2008 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
07/29/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING REBAR @ TRASH ENCLOSURE -- OK TO POUR
03/31/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 CANOPY COLUMN FOOTINGS & 6 LIGHT POLE BASES IN VISITOR/EMPLOYEE PARKING LOT
10/22/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
AUTO DISPLAY ELEVATED SHOWCASE AREA PRE-SLAB
09/20/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 4-SIZE LIGHT POLE BASES IN EAST LOT
08/22/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
08/21/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
OUTDOOR CAR DISPLAY REINFORCEMENT STEEL @ RETAINING WALL FOOTING AS PER DETAIL A1.2/1 OK TO POUR
12/01/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
APPROX. 200 L.F OF FOOTING ACROSS ALLEY FOR 8 FOOT WALL
1. 8" CMU EXTERIOR PERIMETER WALL TO 8FT GRID B TO L
2. 8" & 12" CMU EXTERIOR PERIMETER WALL
TO 4FT GRID 6 TO 8
3. 12" CMU EXTERIOR PERIMETER WALL TO 8FT GRID 2 TO 6
AND L TO M.
11/14/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
8" CMU WALL FOOTING FROM COLUMN LINE L TO C @ LINE #6 12" CMU WALL FOOTING FROM COLUMN LINE C TO A TO #7 TO B+ & FROM #6 TO #7
8" CMU WALL FOOTING FROM B TO L @ #7 & #8 & #7 TO #8 @ B, D, F, J & L
COLUMN FOOTING C-1 @ 5-D
11/13/2006 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
11/09/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
12" CMU WALL FOOTING - GRIDLINE "L" BETWEEN COLUMN LINE 6 AND 7 AS PER DETAIL 5 ON SHEET S3.1
10/24/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/18/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 - F3 COLUMN FOOTING AT ENTRY CANOPY & ELEVATOR PIT
FLOOR AD ADJ. F-5 & F-1 COLUMN FOOTING - REBAR OK
10/13/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
APPROVED EAST BLDG. FOOTING INSPECTED 10/12/2006
10/12/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
10/11/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTINGS B-2 - E -2/3/4 & F - F - 2/3/4 & 5 - G - 2/3 & 4
H-2/3 & 4 - J - 2/3/4 & 5 - K 3/4 & 5 AND GRADE BEAMS @ J-3/4 3-J/K - & 3 - E/F -- OK TO POUR

NOTE: VIEWED SPECIAL INSPECTION REPORT FOR ABOVE.
10/10/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. BLDG. FOOTING @ COLUMN LINE 2 - L TO J W/1-F3 COLUMN FOOTING.
2. BLDG. FOOTING @ COLUMN LINE J - 2 TO 1.4 W/3-F3 COLUMN FOOTINGS.
3. BLDG. FOOTING @ COLUMN LINE1 - C TO J W/4-F5/F-1 & F-3 COLUMNS.
4. BLDG. FOOTING @ COLUMN LINE C - 1 TO 6 W/4-F3 & 1-F2 COLUMNS.
5. 1 COLUMN FOOTING @ L/5 (F-4)