Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 07/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING REBAR @ TRASH ENCLOSURE -- OK TO POUR |
|
| 03/31/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 4 CANOPY COLUMN FOOTINGS & 6 LIGHT POLE BASES IN VISITOR/EMPLOYEE PARKING LOT |
|
| 10/22/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* AUTO DISPLAY ELEVATED SHOWCASE AREA PRE-SLAB |
|
| 09/20/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 4-SIZE LIGHT POLE BASES IN EAST LOT |
|
| 08/22/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 08/21/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* OUTDOOR CAR DISPLAY REINFORCEMENT STEEL @ RETAINING WALL FOOTING AS PER DETAIL A1.2/1 OK TO POUR |
|
| 12/01/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* APPROX. 200 L.F OF FOOTING ACROSS ALLEY FOR 8 FOOT WALL 1. 8" CMU EXTERIOR PERIMETER WALL TO 8FT GRID B TO L 2. 8" & 12" CMU EXTERIOR PERIMETER WALL TO 4FT GRID 6 TO 8 3. 12" CMU EXTERIOR PERIMETER WALL TO 8FT GRID 2 TO 6 AND L TO M. |
|
| 11/14/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 8" CMU WALL FOOTING FROM COLUMN LINE L TO C @ LINE #6 12" CMU WALL FOOTING FROM COLUMN LINE C TO A TO #7 TO B+ & FROM #6 TO #7 8" CMU WALL FOOTING FROM B TO L @ #7 & #8 & #7 TO #8 @ B, D, F, J & L COLUMN FOOTING C-1 @ 5-D |
|
| 11/13/2006 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 11/09/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 12" CMU WALL FOOTING - GRIDLINE "L" BETWEEN COLUMN LINE 6 AND 7 AS PER DETAIL 5 ON SHEET S3.1 |
|
| 10/24/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 10/18/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 4 - F3 COLUMN FOOTING AT ENTRY CANOPY & ELEVATOR PIT FLOOR AD ADJ. F-5 & F-1 COLUMN FOOTING - REBAR OK |
|
| 10/13/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* APPROVED EAST BLDG. FOOTING INSPECTED 10/12/2006 |
|
| 10/12/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 10/11/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS B-2 - E -2/3/4 & F - F - 2/3/4 & 5 - G - 2/3 & 4 H-2/3 & 4 - J - 2/3/4 & 5 - K 3/4 & 5 AND GRADE BEAMS @ J-3/4 3-J/K - & 3 - E/F -- OK TO POUR NOTE: VIEWED SPECIAL INSPECTION REPORT FOR ABOVE. |
|
| 10/10/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. BLDG. FOOTING @ COLUMN LINE 2 - L TO J W/1-F3 COLUMN FOOTING. 2. BLDG. FOOTING @ COLUMN LINE J - 2 TO 1.4 W/3-F3 COLUMN FOOTINGS. 3. BLDG. FOOTING @ COLUMN LINE1 - C TO J W/4-F5/F-1 & F-3 COLUMNS. 4. BLDG. FOOTING @ COLUMN LINE C - 1 TO 6 W/4-F3 & 1-F2 COLUMNS. 5. 1 COLUMN FOOTING @ L/5 (F-4) |