Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) 60 AND PSI TEST FROM VALVE ON EXISTING 5 PSI GAS LINE THRU TO NEW VALVES AT (8) ROOF TOP UNITS 2) WILL NEED TO INSPECT INSTALLATION OF REGULATER AND CONNECTION OT UNITS |
|
| 07/26/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SYSTEM SHALL HOLD MINIMUM TEST PRESSURE WITH NO DROP |
|
| 07/22/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 300 LB. TEST GAUGE NOT ACCURATE IN 5LB. INCREMENTS - PROVIDE A 100 LB. GAUGE |
|
| 07/19/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) MEDIUM PRESSURE GAS PIPING REQUIRE 60 PSI TEST MINIMUM 2) WHERE UNIONS ARE NECESSARY-LEFT AND RIGHT NIPPLE COUPLINGS SHALL BE USED |