Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2005 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 07/07/2005 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HAVE ALL ELECTRIC ADDED TO PLAN/PERMIT 2) EXPOSE VERTICALLY FTGS. TO VERIFY DEPTH 3) HAVE COPY OF PLANS EXISTING HOUSE BOLTS FROM HOUSE CONTRACTOR 4) NEED LADDER TO INSPECT ROOF 5) STOPPED INSPECTION |
|
| 06/28/2005 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) VERIFY POST FTGS/ AND J-BOLT FOR POST ANCHOR AND STEEL (REBAR) 2) WHAT TYPE OF BOLT WAS USED FOR LEDGER, DID YOU DRILL INTO A BOND BEAM, HT ? OF BOND BEAM? 3) YOU HAVE A 3 GANG METAL ELECTRICAL BOX WITH WIRE COMING OUT OF THAT BOX, WHAT ARE THEY FOR AND WHERE DO THEY COME FROM HOW MANY CIRCUITS ARE YOU INSTALLING ? I SEE TWO FANS ONLY ON PLANS 4) NON-METALLIC CONDUIT TO BE 18" BELOW GRADE 5) GO AHEAD AND INSTALL ROOF DECK 6) NICE WORK BEAMS AND POSTS |