Permit: T05CM01915

Parcel: 11706187D


Addresses:

278 E CONGRESS ST


Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T05CM01915

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/02/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
07/31/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
LEE RAY ON SITE PLUMBER NOT READY
07/24/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. DO NOT MIX MATERIALS FOR DRAIN PIPING
2. DO NOT USE A SAN-TEE ON IT'S SIDE YOU MUST USE DIRECTIONAL FITTINGS.
3. GREASE TRAP MUST BE TIED TO BUILDING DRAIN -- YOU MAY NOT DUMP IT INTO FLOOR SINK.
4. PLEASE HAVE QUALIFIED PLUMBING CONTRACTOR MEET ME AT SITE.
04/25/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. NO REVISED APPROVED PLAN ON SITE. REDLINES ONLY.
2. UNABLE TO LOCATE ANSUL VALVE.
3. PEDESTAL LAVATORY NON-ADA COMPLIANT.
WITHOUT APPROVED PLAN UNABLE TO COMPLETE INSPECTION
4. PROVIDE DETAIL FOR GREASE TRAP WITH REVISED APPROVED PLAN.
06/30/2005 PLUMBING - FINAL Partial Approval IVRS - Inspection :* 1) DOUBLE CHECK VALVE ASSEMBLY INSTALLED FOR NON-CARBONATED BEVERAGES. CERIFICATION ACCEPTED. 2) ALL FIXTURES WATER TIGHT. 3) REVIEW AT AZ PLUMBING CODE WITH D MANN INDICATES THAT CURRENT VENTING DOES MEET CODE. 4) FINAL TO BE APPROVED UPON APPROVAL AT RED LINES AND INSTALLATION AT GREASE TRAP.
06/24/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :* 1) PLEASE PROVIDE INSTALLATION OR REVISION OF PLAN FOR INSTALLATION OF GREASE TRAP, NOTE" INSTALLATION OF (2) AIR ADDMITANCE VALUES ON SANITARY DRAINAGE SYSTEM DOES NOT MEET MINIMUM REQUIREMENT FOR VENTING ON MINIMUM 3" BUILDING DRAIN. WE CAN ONLY FIND ( 1) 2" VENT THRU ROOF PLEASE SEE 94 UPC SECTION 904.1 TYPICALLY ( 2) 2" VENTS AND (1) 1 1/2 WOULD MEET THIS REQUIREMENT. RED LINES ON SITE FOR REVISIONS AT LATER DATE. 2) INSTALL ALL FIXURES AND MAKE THEM WATER TIGHT. 3) PROVIDE TESTABLE DOUBLE CHECK VALVE ASSEMBLY AND CERTIFICATION FOR H20 SUPPLY TO NON CARBONATED BEVERAGES.
06/23/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :* 1) PROVIDE DOUBLE CHECK VALVE FOR NON CARBONATED DRINKS. 2) FINISH MAKING ALL DRAIN CONNECTIONS WATER TIGHT. 3) BACK FLOW CERTIFICATION ACCEPTED. 4) GREASE TRAP NOT YET INSTALLED. I WILL DISCUSS WITH DSD DIRECTOR AND ??. 5) PROVIDE APPROVED AS BUILT DRAWINGS.
06/22/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CORRECT DRAINAGE AT 3-COMP SINK AND PROVIDE LONG RADIUS DRAINAGE FITTINGS FOR PREP SINK AND 3 COMP SINK. ITEM #1, 2, 3, 4, 5, 6 AND 7 COMPLETED
2) PLEASE DO ITEMS 8, 9, 10 AND 11
06/20/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*1) EXPOSE DRAINAGE FITTINGS FOR 3 COMP SINK. 2) INDERECT WASTE PIPING TO BE SEPARATE FOR EACH DRAINAGE DEVICE, AND SUPPORTED PROPERLY. 3) PROVIDE CLEANOUT FOR DISPOSER DRAINAGE. PROVIDE REVISED CITY APPROVED PLANS FOR??????????????? CORRECT FIXTURES SHOWN. 4. PROVIDE MINIMUN 1" AIRGAP FOR ALL DRAINS TO INDIRECT RECEPTOR. 5) PROVIDE CORRECT FITTING FOR COPER SOLDERS. 6) TEMPERATURE & PRESSURE RELIEF DRAIN FROM WATER HEATER TO GRAVITY DRAIN TO APPROVED RECEPTOR. 7. WATER HEATER TO BE ON APPROVED STAND OR GROUND AND HAVE CORRECT DIELECTRICAL PROTECTION AT WATER CONNECTIONS. 8. NOW CARBONATED BEVERAGES THAT REQUIRE WATER TO HAVE ??? DOUBLE CHECK VALVE ASSEMBLY WITH CERTIFICATION AND CERTIFICATION FOR ALL BACKFLOW DEVICES. 9. ALL FIXTURES TO BE MADE WATER TIGHT. 10. GAS PIPING NEEDS CITY APPROVED GAS ISOMETRIC PLANS, COMPLETION OF PIPING WITH APPROVED GAS SHUT OFF VALVES, VIEWING OF LISTING PLATES OF GAS APPLIANCES WITH MINIMUM 10 PSI TEST NO PRESURE DROP FOR 15 MINUTES 11. PROVIDE BONDING OF GAS PIPE SYSTEM