Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2005 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* 1) NEW 4" BLDG SEWER P.O.C. TO EXISTING BLDG SEWER IS OK 2) OK TO BACKFILL TRENCH |
|
| 07/26/2005 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) DWV WATER TEST IS OK 2) CORRECTIONS FOR U.G. SOIL WITHIN STRUCTURE IS OK 3) OK FOR BACKFILL 4) SHALL SEE FINAL CONNECTIONS TO HCS AND EXISTING BLDG SEWER |
|
| 07/21/2005 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE A SAN-TEE FOR THE TUB WASTE AND PROVIDE A L-SWEEP BELOW THE SAN-TEE 2) SHALL REPLACE 3 X 2 SAN-TEE FOR LAV WASTE |
|
| 07/20/2005 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE DIRECTIONAL FITTINGS FOR WATER CLOSET AND TWO WAY CLEANOUT 2) RE-TEST THE SYSTEM |
|
| 07/14/2005 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE A WATER TEST ON UNDERGROUND WASTE AND VENT SYSTEM WITH MINIMUM 10' HEAD 2) SHALL EXPOSE ALL 4" WASTE LINE IN TRENCH 3) SHALL REMOVE AND PROVIDE DRECTIONAL FITTINGS FOR TWO WAY CLEANOUT 4) SHALL INSTALL CLOSET BEND FOR WATER CLOSET AND P-TRAP FOR TUB AND SHOWER |