Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/11/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) PENDING COMPLETION OF INTERMEDIATES 2) AT FINAL CEILING FAN BLADES MUST BE 7' + AFF 3) SMOKE DETECTORS TO BE BETWEEN 6 + 12 INCHES OF CEILING 4) SJ CORD, CANNOT BE USED IN WALLS AND CEILING TO A/C UNIT 5) TRAP REQUIRED ON WASHER DRAINS 6) NEED WATER TEST ON DRAINS AND SUPPLY LINES 7) TOILET REQUIRES VENT THRU ROOF 8) NEED T/P RELIEF LINE FOR WATER HEATER 9) DRAIN FOR LAUNDRY TOB REQUIRES SANTEE-NOT WYE 10) USE SANTEES FOR LAV DRAIN 11) EXHAUST FANS NEED TO BE ROUTED OUTSIDE 12) COMPLETE DUCT IN HALLWAY |