Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) 20 PSI AIR TEST TO (3) ROOF TOP UNITS OK |
|
| 09/21/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REMOVE TEE ON ROOF OR PROVIDE CITY APPROVED REVISED GAS ISOMETRIC WITH FUTURE CONNECTION |
|
| 07/19/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1" YARD WATER FROM METER TO BLDG IS OK PENDING INSTALLATION OF CORRECT BACKFLOW DEVICE AT METER. THIS INSTALLATION WILL NEED VIEWING AND CERTIFICATION FOR FINAL |
|
| 07/14/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM 10 PSI TEST ON GAS SYSTEM |
|
| 07/13/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE APPROVED COUPLINGS ON GAS SYSTEM AND INSTALL PIPING PER SIZING ON APPROVED PLAN |
|
| 07/08/2005 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* |