Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2006 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 03/10/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS LINE HOLDING 14 POUND TEST 2) SCREW FLUE PIPES TOGETHER H20 HEATER 3) PTR WATER HEATER TERMINATION TO HAVE MINIMUM 3" CLEARANCE 4) SMOKE DETECTORS MELFUNCTIONING AND MUST BE ARC FAULT PROTECTED 5) STOPPED INSPECTION |
|
| 03/01/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLY WITH ITEMS 1 AND 3 FROM PREVIOUS INSPECTION 2) PROVIDE AIR PRESSURE GAS LINE |
|
| 02/27/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE ARC FAULT BREAKERS FOR BEDROOMS AND SMOKE DETECTORS 2) PROVIDE WATER HEATER ENCLOSURER 3) SEAL BASE OF TOILETS |