Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2005 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*SOIL WATER TEST IS OK OVERHEAD WATER DISTRIBUTION OK FOR DRY WALL |
|
| 10/20/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1 1/2" DIRTY ARM FOR P-1H EXCEEDS 135 DEGREE CHANGE OF DIRECTION. WHEN A HORIZONTAL DRAIN EXCEEDS 135 DEGREE THEN A CLEANOUT IS REQUIRED WHERE IT EXCEEDS 135 DEGREE 2) SHALL PROVIDE ISOLATORS AT EVERY PENETRAION THRU METAL STUDS FOR WATER DISTRIBUTION 3) SHALL PROVIDE A APPROVED COMPLETE SET OF PLANS ON SITE. P.L. PAGE IS MISSING 4) CHECK STRAPS FOR OVERHEAD 1 1/2" C.W. |