Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2005 | ENGINEERING - FINAL | Approved | ||
| 10/31/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR STAFFING AND STOCKING ONLY, NO PUBLIC ACCESS. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE SITE WORK IS 100% COMPLETED. PUBLIC ACCESS NOT TO BE GIVEN UNTIL THE ITEMS LISTED ON THE 10/19/05 SITE INSPECTION ARE COMPLETED AND APPROVED. |
|
| 10/19/2005 | ENGINEERING - FINAL | Denied | PRIOR TO ENGINEERING APPROVAL FOR A C OF O, THE FOLLOWING ITEMS MUST BE COMPLETED: 1) ALL SITE WORK TO INCLUDE, BUT NOT LIMITED TO THE FOLLOWING: A) ALL SIDEWALKS COMPLETED B) PARIKING LOT STRIPING/HC AND LOADING ZONE C) COMPLETE ROOF DRAINS W/DOWNSPOUT AND SPLASH BLOCKS. D) COMPLETE ALL DRAINAGE STRUCTURES. E) COMPLETE LANDSCAPING F) COMPLETE TRASH ENCLOSURE 2) ANY SIGNIFICANT CHANGES TO THE APPROVED PLANS MUST BE SHOWN (REVISED) AND APPROVED BY THE ENGINEER OF RECORD AND THE CITY OF TUCSON. 3) ALL CONSTRUCTION ACTIVITY MUST BE SEPARATED FROM THE PUBLIC TO PREVENT ANY LIFE/SAFETY HAZARDS. |