Inspection History Details
Inspection Status: Approved
Inspection History: MEDICAL - GAS/TEST INTERMED
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2005 | MEDICAL - GAS/TEST INTERMED | Approved | PER MECH FINAL | |
| 10/11/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* | |
| 09/21/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) TEST #11 TOW PRESS TEST 2) OP. RM'S, 3 AND 4 3) ZONE VALVE BOX TO OUTLETS-80 PSI |
|
| 09/14/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) ? #09 OP. RMS. #3/4; HI PRESS. 2) TEST #10 OP. RMS. 1 AND 2 LO PRESS. 80 PSI |
|
| 09/08/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) MED GAS TEST #08 O.R. 160 PSIG 2) ZONE BOX TO OVERHEAD 02 OPERATING ROOMS 1 AND 2 MED AIR, MV, ? VAC. AND N2 N20 3) MED GAS #7 LOW PRESSURE 80 PSIG 4) RM.R. 139/141 02/VACCUM |
|
| 08/31/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* MED. GAS SYS TEST #6 O2 - MEST.? AIR - 80 PSI VACUUM - LOW PRESS TEST |
|
| 08/29/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* | |
| 08/25/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* | |
| 08/22/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) TEST PRESS #2 2) 160 PSI - ZONE VALVES - SOUTH LP. TO RECOVERY RMS. A AND C |
|
| 08/08/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) OPERATING ROOM #3-OVER HEAD PIPING PROGRESSING OR #4-PROGRESSING |
|
| 08/03/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) VERIFIED PRESSURE TESTS-PROGRESSING |
|
| 08/02/2005 | MEDICAL - GAS/TEST INTERMED | Partial Approval | IVRS - Inspection :* 1) JOHNATHON POELING-CERTIFIED-9/26/06 NITC 2) 6 PIPE SYSTEM: O2, N2, N20, MV, M-AIR AND SV SANITARY 160 PSI |