Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2005 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) OK FOR FINAL C OF O |
|
| 09/01/2005 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM 1" CLEARANCE FROM COMBUSTIBLES WHERE WATER HEATER VENT PENETRATES THE ROOF. STRAIGHTEN VENT PIPE, EXTEND 1 SEWER VENT 2' ABOVE EVAP COOLER. PROVIDE STAINLESS STEEL ON BOTH SIDES OF THE HOOD TO COVER THE SHEET ROCK SEE SECTION 507.9 2000 IMC. PROVIDE A GREASE CUP ON EXHAUST FAN. FIRE WRAP IS OK. OK FOR CEILING TILES EXCEPT AROUND WATER HEATER VENT |