Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2005 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 09/26/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* INSULATE ALL HOT PIPING PER PLAN. COMPLETE COLD 1 1/4 SUPPLY PER PLAN AND FINISH OVERHEAD ALONG SOUTH & WEST WALL. | |
| 09/01/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ALL UNDERGROUND OK PER REVISED PLAN TEST TO ROOF OK ON ALL VENT STACKS 2) FINISH BRACING/SUPPORTING VENT STACKS |
|
| 07/22/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLANS HAVE BEEN APPROVED IN ERROR: ISOMETRIC SHOWS MOP SINK CONNECTED TO GREASE TRAP. THIS IS A VIOLATION OF UPC 1011.3. YOU MAY NOT TIE 2 FIXTURES TO SAME FLOW CONTROL AND FLOW CONTROL MUST BE IN A VISIBLE AND ACCESSIBLE LOCATION 2) WHY IS MOP SINK BEING CONSIDERED AS A GREASE GENERATING FIXTURE ? 3) VERIFY 3 COMPARTMENT SINK DOES NOT REQUIRE AN INDIRECT WASTE CONNECTION |