Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM01554
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/21/2006 | ENGINEERING - FINAL | Approved | ALL PREVIOUSLY NOTED PROBLEMS HAVE BEEN COMPLETED AT THIS TIME. | |
12/04/2006 | ENGINEERING - FINAL | Partial Approval | VISITED THE SITE AND NOTED THE WORK THAT IS ON GOING AT THIS TIME. CONTACTED THE WATER DEPARTMENT TO SEE WHAT PORTION OF THIS WORK IS THEIRS TO COMPLETE, THEY HAVE ACKNOWLEDGED THE REMAINING ITEMS TO BE COMPLETED IN THE NEAR FUTURE. THIS SITE HAS BEEN GIVEN A PARTIAL BECAUSE OF THE COMPLETION OF OTHER ITEMS ON THE PREVIOUS PUNCHLIST, BUT THE FINAL WILL NOT BE GIVEN UNTIL ALL OF THE WORK ON/ADJACENT TO THIS SITE HAS BEEN COMPLETED FULLY. | |
12/04/2006 | ENGINEERING - FINAL | Denied | SEE INSPECTION NOTES FROM 11/14/06, DAVID ROBERTS TO LOOK AT THE SITE. | |
11/27/2006 | ENGINEERING - FINAL | Denied | SEE INSPECTION NOTES FROM 11/14/06 | |
11/14/2006 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to: 1- Finish patching street. 2- Contractor needs to dress up detention basin before C of O can be issued. 3- Remove dumpster from site. |
|
10/18/2006 | ENGINEERING - FINAL | Correction Required | Contractor cleaned up concrete and and drywall wash out. Contractor will need to dress up detention basin before C of O can be issued. | |
10/11/2006 | ENGINEERING - FINAL | Correction Required | Contractor issued Correction Notice. Contractor has five (5) days to make corrections or Stop Work Order will be issued. Contractor needs to: 1- Romove concrete dumped in spillway to basin and replace rip rap. 2- Clean all drywall or paint wash out from basin and spillway. 3- Install controls in basin inlet. 4- Clean site. Spoke to site super in regards to. |