Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T05CM01492
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2005 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
08/11/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1 INSTALL GAS BOND-INSTALLED WHILE ON SITE 2 LABEL ALL CIRCUITS MAIN SVC PNL 3 NO WHITE WIRES ON HOT LEG BREAKER MUST BE RED OR BLACK 4 REMOVE TEMP GFCI FRM SVC 5 SECURE LIQUID TIGHT AT CONDENSER DISCO 6 INST LIGHT FIXTURE PANTRY 7 INSTALL DISHWASHER 8 COVER PLATE MICROWAVE OUTLET 9 STANDING H20 ON DECK MUST DRAIN TO SCUPPERS 10 SECURE DISCO ROOF TOP UNIT 11 PROVIDE ARC FAULT BRKRS IN BDRMS PER FAULT 12 PROVIDE GFCI FOOF TOP UNIT FOR SVC 13 ROOFTOP OVER FUSED GAS CARD OK |