Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05CM01482
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* (6) BACKFLOW CERTIFICATIONS TURNED IN |
|
| 04/16/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ROOFTOP WATER PIPING TO BE INSULATED TO PROTECT FROM FREEZING. 2. PROVIDE BTU RATED FLEXES FOR ALL GAS APPLIANCES AND PROVIDE SEDIMENT TRAPS AT WATER HEATER AND FURNACE GAS ENTRY. 3. PROVIDE CORRECT DRAINAGE FOR 3-COMP SINK 4. PROVIDE DIELECTRIC CONNECTION FOR COPPER TO GALV AT WATER HEATER. 5. SECURE WATER HEATER EXPANSION TANK. 6. EACH CARBONATOR REQUIRES SEPARATE BACKFLOW PROTECTION WITH DRAIN PIPED TO CORRECT RECEPTOR WITH CERTIFICATIONS. 7. GAS APPLIANCES ON WHEELS REQUIRE SAFETY CABLES. 8. PROVIDE SEPARATE FULL SIZE WATER PIPING TO ALL REQUIRED BACKFLOW DEVICES. 9. PROVIDE FULL SIZE PIPING TO WATER FILTER SYSTEM FOR WATER SUPPLY. 10. PROVIDE PROOF OF 1" AIR GAP OR PROVIDE BACKFLOW PROTECTION FOR ICE MACHINE OR LISTING FOR BACKFLOW PROTECTION. 11. PVC SCH 40 PIPING (PRESSURE OF DWV) REQUIRES PRIMER THEN GLUE. 12. PROVIDE ACCESS TO TRAP PRIMERS & HAMMER ARRESTORS 13. PROVIDE CORRECT CRITICAL LEVEL FOR URINAL FLUSH VALVE. LIST MAY NOT BE COMPLETE. |