Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 03/06/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* (HOLD OVER PER CONTRACTOR FROM 3/2/07 TO 3/6/07) CONDENSATE DRAIN FROM ROOF UNIT PIPING OK REPAIR AT FLOOR DRAIN UNDERGROUND AT COOLER OK |
|
| 03/01/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WASTE & VENT THRU ROOF OK EXCEPT 3" C/O STACK IN STORAGE. SHALL RETEST. WATER PIPING OK SHALL PROVIDE WATER HAMMER ARRESTORS AS REQUIRED. |
|
| 02/28/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER TEST 3" RD & OFRD (3) LOCATIONS PARTIAL 1 ENGINEER TO SEND STAMPED LETTER FOR 3" DRAINAGE PIPING BECAUSE OF CONFLICT ON PLAN OF 3" OR 4" SHOWN. |