Permit: T05CM01466

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
09/24/2007 ENGINEERING - FINAL Approved A REVISED BICYCLE PARKING PLAN HAS BEEN SUBMITTED TO THE C.O.T. FOR REVIEW AND APPROVAL.
PONDING WATER WILL BE ADDRESSED WITH OTHER SITE PAVING PROBLEMS.
THE FINAL GRADING INSPECTION IS IN PROGRESS OUTSTANDING ISSUES WILL BE ADDRESSED BEFORE FINALING THIS PROJECT.
09/20/2007 ENGINEERING - FINAL Denied 1. PROVIDE (3) CLASS 2 BICYCLE PARKING SPACES.
2. PROVIDE (2) CLASS I BICYCLE PARKING ENCLOSURES.
3. COMPLETE ALL SITE WORK AND CALL IN FINAL GRADING INSPECTION WHICH MUST BE COMPLETED BEFORE ISSUANCE OF C OF O.
4. PROVIDE OPENINGS IN TYPE II SCUPPERS TO ACCEPT ROOF DRAINAGE.
5. CORRECT PONDING WATER AT WEST H/C PARKING SPACE IN FRONT OF BUILDING AND AT THE H/C RAMP ON EAST SIDE OF DRIVEWAY EAST OF BUILDING.
08/01/2007 ENGINEERING - FINAL Denied SEE ALL PREVIOUS INSPECTION COMMENTS
IN ADDITION, CORRECT PONDING WATER AT WEST H/C PARKING SPACE IN FRONT OF BUILDING AND AT THE H/C RAMP ON EAST SIDE OF DRIVEWAY EAST OF BUILDING.

RE-FEE FOR INSPECTION DUE TO PREVIOUS PUNCH LIST ITEMS NOT CORRECTED.
07/26/2007 ENGINEERING - FINAL Denied SEE COMMENTS ON PREVIOUS INSPECTIONS, NOTES 2,3 & 5.
1. PROVIDE (3) CLASS 2 BICYCLE PARKING SPACES.
2. PROVIDE (2) HANDICAP PARKING SIGNS.
3. PROVIDE (2) CLASS I BICYCLE PARKING ENCLOSURES.
4.COMPLETE ALL SITE WORK AND CALL IN FINAL GRADING INSPECTION WHICH MUST BE COMPLETED BEFORE ISSUANCE OF C OF O.
6. PROVIDE OPENINGS IN TYPE II SCUPPERS TO ACCEPT ROOF DRAINAGE.
7. REMOVE CONSTRUCTION MATERIAL AND DEBRIS, ROLL-OFF AND OUTHOUSE FROM PARKING AREAS. SWEEP LOT.
03/19/2007 ENGINEERING - FINAL Denied 1. COMPLETE HANDICAP RAMPS AND REPAIR TRUNCATED DOMES.
2. PROVIDE (2) HANDICAP PARKING SIGNS.
3. PROVIDE (2) CLASS I BICYCLE PARKING ENCLOSURES.
4. COMPLETE ALL STRIPING.
5, COMPLETE ALL SITE WORK AND CALL IN FINAL GRADING INSPECTION WHICH MUST BE COMPLETED BEFORE ISSUANC OF C OF O.
12/06/2006 ENGINEERING - FINAL Denied 1. COMPLETE ASPHALT PAVING NORTH OF BUILDING.
2. COMPLETEE HANDICAP RAMPS WITH TRUNCATED DOMES.
3. PROVIDE (2) HANDICAP PARKING SIGNS.
4. PROVIDE GATES ON TRASH ENCLOSURE.
5. PROVIDE (2) CLASS I BICYCLE PARKING ENCLOSURE.