Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 07/18/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. YARD WATER 12' IN FROM METER BOX RUNS IN FRONT OF BUILDING TO THE WEST AND NORTH AND EAST BACK TO BUILDING TRACER WIRE OK 2. REDLINE DRAWING TO BE APPROVED BY CITY OF TUCSON. |
|
| 07/14/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/09/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* PERMIT CARD IS TO BE POSTED ON SITE. YARD WATER LINE INSPECTION WATER LINE NOT INSTALLED PER PLAN SITE PLAN IS NOT APPROVED BY PLUMBING EXAMINER NEVER USE AIR TO TEST PVC - RELEASE AIR PRESSURE! HYDRO TEST W/WATER |
|
| 04/05/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PIPE WRAPS OK FOR CONCRETE. APPROVAL OF ROUGH WILL REQUIRE PLAN REVISION, REVISION MUST MATCH REDLINE @ CHANGES. SITE SEWER -- 4" ABS - 40' TO SEPTIC LOCATION, PIPING OK PROVIDE MIN 18 GAGE GREEN TRACE WIRE |
|
| 04/03/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* JIM-SUPERINTENDENT SEVERAL CHANGES HAVE BEEN MADE TO APPROVED PLAN. PIPING INSTALLED PER REDLINES ON PLAN. OK TO PROCEED, ALTHOUGH FINAL APPROVAL SHALL BE CONTINGENT ON RECEIVING REVISED PLAN THAT MATCHES REDLINE CHANGES. PROVIDE FOAM PIPE WRAP PROTECTION ON DWV AND ON PEX WATER LINES, WHERE PENETRATING SLAB. CALL FOR ROUGH INSPECTION PRIOR TO POURING CONCRETE. |
|
| 03/31/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOT INSTALLED PER PLAN WC'S ROUGHED IN NOT ON PLAN PLAN SHOWS 4' BRANCH LINES ONLY 2" & 3" INSTALLED. PLANS WILL NEED TO BE REVISED. IF PLAN HAS REDLINE CHANGES I WOULD PARTIAL APPROVE. |