Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
Permit Number - T05CM01364
Inspection Description - ELECTRIC - CONSTRUCTION POWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2007 | ELECTRIC - CONSTRUCTION POWER | Approved | IVRS - Inspection :* | |
01/29/2007 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | IVRS - Inspection :* | |
01/19/2007 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | IVRS - Inspection :* | |
12/15/2006 | ELECTRIC - CONSTRUCTION POWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
11/14/2006 | ELECTRIC - CONSTRUCTION POWER | Denied | IVRS - Inspection : The service is not per code.| 210* 1. PROVIDE CERTIFICATION LETTER FROM G.E FOR SERVICE. 2. BOND ALL METAL PIPING TO SERVICE. 3. PROVIDE LETTER FROM THE ELECTRICAL ENGINEER OF RECORD (SEALED LETTER) THAT THIS SERVICE IS ACCEPTABLE PROVIDE BRAND, TYPE AND AFC IN LETTER. 4. SECURE SERVICE TO SLAB 5. PROVIDE LETTER OF TORQUE. 6. INSTALL MAIN BONDING JUMPER. 7. SERVICE HAS BEEN ALTERED BY MISC. WELDING AND BRACING AND ACCESS PANEL REQUIRED BY CODE AND LISTING HAVE BEEN CLOSED OFF. |