Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/04/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) YOU NEED A 3" CLEANOUT AT EXT. OF SLAB SOUTH, OR INSTALL AN UPPER TERMINAL CLEANOUT AT NORTH END OF NEW TRUNK LINE 2) TUB/SHOWER IS NOT VENTED, REMOVE LOW HEEL FITTING AT TOILET REPLACE WITH A COTTAGE TEE, INSTALL "P" TRAP AND RE-TEST PIPE 3) CLAY PIPE FENCO BANDS NOT ALLOWED UNDER SLAB, MAKE SURE YOUR SLAB ENDS, AT PIPE LINE 4) TRAP ARM FOR LAV COULD BE DONE AFTER SLAB IS POURED, BY WET VENTING THE TOILET, SEE DETAIL ABOVE |