Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2005 | PLUMBING - FINAL | Approved | 1) AIR GAPS AT INDIRECT WASTE OKI 2) HOSE REMOVED AT SINK 3) REMOVED HAND SINK THAT REQUIRES DIRECT WASTE CONNECT OTHER EXISTING CONDITIONS OK |
|
| 06/08/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* PENDING 1090 NOTES FOR C OF O FROM THIS INSPECTION. 3025 APPROVED ( WORK IN BAR AREA APPROVED). 1) HAND SINK ON WEST WALL SHALL BE CONNECTED TO DIRECT DRAINAGE WITH APPROVED PIPING MATERIALS & SIZES. NOT INTO 3- COMP WASTE DRAINAGE THRU GREASE TRAP. 2) GREASE WASTE REQUIRES FLOW CONTROL AND APPROVED RECEPTOR LIKE FLOOR SINK NO P-TRAP ABOVE GROUND UNDER SINK. 3) BACKFLOW PROTECTION IS REQUIRED ON CARBONATER, ICE MACHINES, COFEE MAKERS, ANY DIRECT CONNECTED H20 USING DEVICE WITHOUT 1" PROOF OF AIR GAP. 4) DRAINS FROM PROP SINK, 3-COMP SINK TO HAVE MINIMUN 1" AIR GAP. 5) HOSE WITH SPRAY END ON 3-COMP SINK FAUCET REQUIRES BACKFLOW PROTECTION OR CORRECT CAPABILITY FOR 1" AIR GAP. 6) ALL DRAINS INTO INDERECT WASTE RECEPTORS REQUIRE 1" MINIMUM AIR GAP. |