Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM01287
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*WATER TEST UNDERGROUND WASTE & VENT THRU ROOF OK | |
10/27/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*PROVIDE WATER TEST ON UNDERGROUND PIPING INSTALL WASTE & VENT PER PLAN INSTALL H20 PIPING PER PLAN WATER HEATER T & P TO GRAVITY DRAIN TO DAYLIGHT OR APPROVED RECEPTOR PLUMBER CONTRACTOR TO BE ON SITE FOR NEXT INSPECTION PROVIDE SUPPORTS FOR ALL DRAIN PIPING AT CORRECT INTERVALS WITH 1" AIR GAP |
|
05/11/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) 8 FOOT SPA'S INSTALLED WITHOUT PERMITS AND INSPECTIONS. SINK RELOCATED, WASHING MACHINE BOX DRAIN AND H20 ADDED 2) PROVIDE PIPING PER YOUR APPROVED PLANS WITH INSPECTION AND TESTING 3) EXPOSE WASTE AND VENT AT NEW FLOOR SINK LOCATIONS UNDER CHAIRS WHEN FLOOR SINKS ARE BEING INSTALLED 4) INSTALL H20 PIPING PER PLAN WITH BACKFLOW PROTECTION REQUIRED PER PLAN 5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO GRAVITY DRAIN TO DAY LIGHT 6) EXPOSE P-TRAP AT WASHING MACHINE DRAIN FOR INSPECTION 7) EXPOSE SINK CLEANOUT AT P-2 LOCATION 8) PROVIDE POSSIBLE CAMERA VIEWING OF MAIN SEWER IF NECESSARY 9) EXPOSE VENT PIPING TO VERIFY SIZING OF VENT AND TERMINATION THRU ROOF 10) DEPENDING ON SIZING OF BLDG DRAIN WHAT IS VIEWED AT NOTE #3, 6 AND 7 WHEN VIEWING IS MADE POSSIBLE, ADDITIONAL TESTING AND INSTALLING OF CORRECT PIPING FOR APPROVED PLAN WILL BE REQUIRED |