Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/27/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE COT APPROVAL FOR FLOOR CUT 2. NEED TO INSPECT AND ALSO LSI INSPECTION OF CABLE OUT BEFORE POUR 3. OK TO INSULATE & DRY WALL |
|
| 07/13/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BLOCK 3 SIDES OF DCUT OPENINGS 2) 2 LAYERS OSB REQUIRED FOR FIRE BLOCK AT ARCH |
|
| 07/12/2005 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) TOILET LOCATE BEING CHANGED 2) NEED ENGINEER FOR P.T. CUT |
|
| 07/11/2005 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) SUBS STILL WORKING 2) STOPPED INSPECTION |