Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM01185
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2006 | ENGINEERING - FINAL | Approved | ||
| 04/11/2006 | ENGINEERING - FINAL | Partial Approval | NOT READY | |
| 01/30/2006 | ENGINEERING - FINAL | Partial Approval | OKAY TEMP C/O PER CRAIG GROSS | |
| 01/30/2006 | ENGINEERING - FINAL | Partial Approval | NOT READY FOR PUBLIC OCCUPANCY. SEE NOTES 2-5 OF PREVIOUS INSPECTION. 1. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PUBLIC AND PEDESTRIAN ACCESS. 2. PROVIDE LETTER FROM ENGINEER REGARDING CONTRUCTION OF DRAINAGE FACILITIES. 3. RENEW EXPIRED GRADING PERMIT T04BU01927 AND CALL IN FINAL GRADING INSPECTION #09190. |
|
| 12/29/2005 | ENGINEERING - FINAL | Partial Approval | STOCKING ONLY TEMPORARY C OF O APPROVED STOCKING ONLY. 1. PROVIDE PARKING AND PEDESTRIAN ACCESS FOR STOCKING PERSONNEL ON AREAS THAT WHERE CONSTRUCTION HAS ALREADY BEEN COMPLETED. 2. COMPLETE ALL PAVING, CURBS, SIDEWALKS AND THE SITE WALL. 3. COMPLETE ALL PAVEMENT STRIPING, STOP SIGNS, HANDICAP PARKING, NO PARKING AND ALL BICYCLE PARKING. 4. COMPLETE ALL DRAINAGE STRUCTURES. 5. CALL FOR RE-INSPECTION OF ALL SITE WORK PRIOR TO OCCUPANCY BY THE GENERAL PUBLIC. |