Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM01144

Parcel: 10604098C

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
09/06/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
1. CORRECTIONS MADE OK
2. REVISED GAS PLAN ON SITE GAS INSTALLED CLOSE TO PLAN
3. OK TO COVER ALL AREAS
08/21/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
DISCUSSED WITH ROLAND INTERMEDIATE REQUIRMENTS.
08/16/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1. PLUMBERS TAPE NOT APPROVED
2. CALL FOR PLUMBING GAS PRESSURE TEST BEFORE INTERMEDIATE INSPECTION
340 ALL ON ONE ACTIVITY #
08/14/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
- SUPPORT ALL VERTICAL PIPE
- ARMAFLEX THAT ISN'T PRE-COATED TO BE SEALED WITH LAGGING ADHESIVE.
- OK TO RECOVER CLOSET BINS
08/07/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1. HAVE THE PLUMBER COMPLETE HIS WORK BEFORE CALLING INSPECTION.
- INSULATION COMPLETE AND NOT INSTALLED CORRECTLY.
- SUPPORT VERTICAL PIPE
SUPPORT OVERHEAD PIPE
PLUMBERS TAPE NOT APPROVED
- NO TEST ON ABS
- ABS RE-ROUGHED AT WCS AND COVERED W/O INSPECTION.