Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
Permit Number - T05CM01036
Inspection Description - EXT METAL CLIPS/EXT SHEATHING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/16/2005 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
09/15/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
05/20/2005 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) NO PLANS/PERMIT |
|
05/11/2005 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) CRIPPLES BETWEEN FLLOR AT LOAD PTS. FROM 2ND FLOOR 2) NEED ANSWER FROM ENGINEER REF. STRAPS BETWEEN FLOORS 3) BROKEN TRUSS ROOF 4) CLIP SHEARS TOGETHER 4) DON'T LOAD ROOF |
|
05/09/2005 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) HOUSE NOT READY FOR INSPECTION ROOF NOT NAILED OFF O.S.B. TURNED PARALLEL TO TRUSSES TO BE BLOCKED 2) NAIL OFF ROOF AT FRIEZE BLOCKS, BRING DBL STUDS DOWN BETWEEN FLOORS, NAIL ROOF DECK, TIE SHEAR TO TRUSS CHORDS PER SCHEDULE, RAT RUN AT TRUSS 88 C2 AND 88C5 AND FLLOR TRUSSES |
|
05/04/2005 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) WALK HOUSE 1ST, THEN CALL INSPECTION |