Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM00939

Parcel: 110121000


Addresses:

5140 E GLENN ST

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
04/27/2006 ENGINEERING - FINAL Approved
10/26/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED FOR "B" SECTION (EAST PORTION OF BLDG.) ."A" SECTION TEMP C OF O WAS APPROVED 9/16/05.

PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T03BU03222 IS COMPLETED AND APPROVED.
09/16/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T03BU03222 IS COMPLETED AND APPROVED.
2. BARRICADE AREA AT THE SOUTHWEST CORNER OF THE BUILDING UNTIL THE SLOPE CONSTRUCTION IS COMPLETE AND SAFE.
09/15/2005 ENGINEERING - FINAL Denied 1. FINISH GRADING AROUND BUILDING
2. PROVIDE A 6' SIDEWALK ON THE EAST SIDE OF BLDG.
3. CONSTRUCT THE TRASH ENCLOSURE TO C.O.T. DEVELOPMENT STANDARD SPECIFICATIONS.
09/09/2005 ENGINEERING - FINAL Denied MET WITH MIKE BARTLETT/PATHWAYS DEV. AND JEFFERSON STEIN/ENGINEER.
NEED REVISED AND C.O.T. APPROVED GRADING PLAN FOR INSPECTION PURPOSES.
09/07/2005 ENGINEERING - FINAL Denied 1. COMPLETE ALL SITE WORK
2. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.