Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM00921

Parcel: 123053680

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
09/15/2005 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
06/08/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) REMOVE 1" LINE STUBBED FOR FUTURE H20 HEATER (NOT ON PLAN)
2) MUST EXTEND ALL PIPING INTO APPLIANCE ROOMS
3) CHECK STRUCTURAL INTEGRITY-ADDITIONAL ROOF LOAD ON EXISTING RAFTERS. MIGHT BE TO MUCH ADDITIONAL LOAD FOR EXISTING RAFTERS. NEED POSITIVE CONNECTION ALL 2 X 6 LAY-UPS ON ROOF TO EXISTING (STOPPED INSPECTION)