Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/08/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REMOVE 1" LINE STUBBED FOR FUTURE H20 HEATER (NOT ON PLAN) 2) MUST EXTEND ALL PIPING INTO APPLIANCE ROOMS 3) CHECK STRUCTURAL INTEGRITY-ADDITIONAL ROOF LOAD ON EXISTING RAFTERS. MIGHT BE TO MUCH ADDITIONAL LOAD FOR EXISTING RAFTERS. NEED POSITIVE CONNECTION ALL 2 X 6 LAY-UPS ON ROOF TO EXISTING (STOPPED INSPECTION) |