Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/03/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 6 PSI AIR TEST FROM (2) 4" END OF LINE CLEANOUTS THRU (1) RESTROOM TO 2' PAST BLDG 2-WAY CLEANOUT OK. NEED TO VIEW PIPE WRAP PRICK TO CONCRETE |
|
| 08/02/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) 5 PSI MINIMUM AIR TEST ON ROUGH SOIL 2) WILL NEED TO VERIFY IF BACKWATER VALVE IS NEEDED. ROOF DRAINS (5) LOCATIONS STUBBED UP AND OUT 3' OK PENDING 5 PSI AIR TEST AT LATER DATE. COVER AT OWN RISK |