Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2005 | PLUMBING - GAS RECONNECT | Approved | IVRS - Inspection :* 1) SEWER HCS IS P.O.C. TO EXISTING BLDG DRAIN 2) PLUMBING FINAL OK 3) OK FOR C OF O PENDING ANY OTHER INSPECTION |
|
| 08/15/2005 | PLUMBING - GAS RECONNECT | Not ready for Inspection | 1) SEE NOTE #2 FROM 7/26/05 ALL COMMERCIAL PROJECTS REQUIRE ISOMETRIC DRAWINGS. NO GAS ISO-WILL WAIVE ISO REQUIREMENT 2) GAS PIPING TO BE AT LEAST 6" AFF 3) REQUIRE EXPANSION TANK AT WH 4) REQUIRE INSULATION ON HOT SIDE 5) DOME STRAINER AND GRATE AT FS |
|
| 08/02/2005 | PLUMBING - GAS RECONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/26/2005 | PLUMBING - GAS RECONNECT | Not ready for Inspection | IVRS - Inspection :* |