Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
Permit Number - T05CM00875
Inspection Description - PLUMBING - GAS PRESS TEST FNL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2005 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
08/02/2005 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) UNABLE TO LOCATE POOL INSPECTIONS SUMP AND EQUIPMENT NOT ACCESSIBLE 2) MECH ROOM LOCKED 3) UNABLE TO INSPECT GAS 4) CONTRACTOR TO PAY REINSPECTION FEE |
|
07/26/2005 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1) REFER TO ADDITIONAL NOTE LEFT WITH INSPECTION REPORT FROM 4/8/05 2) NO GAS ISOMETRIC 3) GAS COVERED WITHOUT INSPECTION 4) WHO INSPECTS THE POOLS ? I WANT TO SEE THEIR APPROVAL NOTES 5) SUMP DRAIN COVERED-SEE NOTES 5/6/05 AND 5/26/05 6) MECH ROOM NOT APPROVED |