Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05CM00839

Parcel: 133163020

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T05CM00839

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
04/10/2006 PLUMBING - FINAL Approved
04/05/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
REFEE SHALL BE PAID FOR FINAL INSPECTION.
04/03/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
CONTRACTOR TO READ ALL NOTES FROM 3/24/06 & 3/31/06 INSPECTION. PAY REFEE, MAKE CORRECTIONS
CALL FOR INSPECTION. REFEE TO BE PAID WITHIN (5) WORKING DAYS NO FINAL INSPECTION UNTIL REFEE PAID.
03/31/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
COMPLETE ALL PLUMBING WORK FOLLOW REQUEST FROM 3/24/04 THEN CALL FOR INSPECTION.
03/24/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
UNITS S348 AND S449. BUILDING S
BOTH UNITS ARE UPSTAIRS ABOVE 349
PLAN SHOWS PLUMBING WORK IN S348 ONLY
DW DRAIN HOSE SHALL BE SECURED W/2 HOLE CLAMP
AS HIGH AS POSSIBLE AND NOT LESS THAN 2" BELOW FLOOD LEVEL.
DW SHALL BE SECURED
CONNECT CONDENSATE TO LAV
03/22/2006 PLUMBING - FINAL Cancelled IVRS - RI canceled