Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/28/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/26/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BLOCK EXHAUST FAN BOOTS A BREEZEWAY 2) NAIL PROTECT DRYER VENT 3) COMPLETE LATH 4) SEAL ALL PENETRATIONS 5) REPAIR STUDS IN UTILITY THAT ARE OVERBORED 6) FIRE STOP CHASES BELOW WALKWAY IN GREAT ROOM 7) COMPLETE ALL HOLDOWNS 8) TIGHTEN ALL AB 9) NAIL PROTECT WIRES IN BED 2 BATH 10) ENSURE ACCESS TO KITCHEN DOWN DRAFT VENT SYSTEM 11) STOPPED INSPECTION |
|
| 10/06/2005 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) MUST COMPLETE ALL TRADES AND LATHE 2) THEN CALL FOR ALL APPLICABLE INSPECTIONS 3) WE DO NOT DO FRAME INSPECTION UNTIL ALL TRADES ARE DONE |