Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2005 | ENGINEERING - FINAL | Approved | ||
| 07/05/2005 | ENGINEERING - FINAL | Denied | SEE THE PREVIOUS COMMENTS FOR THIS SITE DATED 6/27/05 PLUS THE FOLLOWING ITEMS: 1)ROOF DRAINAGE DEPOSITS DIRECTLY ONTO THE SIDEWALK AT THE BUILDING ENTRANCE. 2) THE DRAINAGE WAY IS NOT COMPLETE ALONG THE REAR OF THE STRUCTURE. 3) FENCE ALL ADJACENT AREAS THAT ARE NOT GOING TO BE COMPLETED BY THE DATE OF THE NEXT INSPECTION. 4) TRUCATED DOMES ARE REQUIRED ON ALL ADA RAMPS ON THIS SITE. THIS NOT TO BE CONSIDERED TO BE A FINAL LIST FOR THIS SITE DUE TO THE INCOMPLETENESS OF THE SITE AT THIS TIME. CONTACT JOHN BRUCKMEIER IF THERE ARE ANY QUESTIONS ON WHAT IS STILL NEEDED ON THIS SITE PRIOR TO THE FINAL RELEASE OF ALL BUILDINGS AND BONDS. |
|
| 06/27/2005 | ENGINEERING - FINAL | Denied | NOT READY CALL FOR INSPECTION WHEN ALL SITE WORK IS COMPLETED |