Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS RECONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2005 |
PLUMBING - GAS RECONNECT |
|
Not ready for Inspection |
IVRS - Inspection :* 1) HAVE GAS FIRED WATER HEATER ADDED TO YOUR PERMIT AND CALL IN ALL REQ'D INSPECTION.2) INSULATE ALL EXTERIOR EXPOSED WATER PIPING PROVIDE DI-ELECTRIC PROTECTION WHERE COPPER JOINS GALVANIZED. 3) GAS PIPE AT AND BELOW GRADE REQUIRES PROTECTION. 4) PROVIDE BOND BETWEEN WATER AND GAS. 5) EXPOSE VALVE AND CONNECTION TO STOVE. |