Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2005 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 08/16/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PERMIT REQUIRED FOR GAS RECONNECT 2) RECALL FOR INSPECTION PRESSURIZE GAS LINE WITH 10 POUNDS MINIMUM |
|
| 07/06/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PAINT CONDENSATION LINE ON ROOF. 2) ELECTRICAL COVERS ON RECEIPTS IN BEDROOM. 3) PROVIDE COMBUSTION AIR VENTILATION FOR WATER HEATER ROOM. 4) PROVIDE 1" CLEARANCE @ FLUE PIPE FROM FLAMABLE MAT .ROOF. |