Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2006 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 04/19/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NEED 60 DEGREE ON FLUE |
|
| 04/18/2006 | BUILDING - FINAL | Denied | CALLED SERVERAL TIMES AND LEFT MESSAGES NO ANSWER NO ONE HOME |
|
| 04/13/2006 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/21/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) A/C IS OVERFUSED AND DISCONNECT IS NOT ACCESSIBLE PER CODE AND CHECK CLEARANCES 2) NEED ARC FAULT BREAKER FOR BED CIRCUIT 3) TAPE FLUE JOINTS 4) HARD PIPE TPR DRAIN 5) NEED GAS DRIP LEG |