Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM00742
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/17/2007 | ENGINEERING - FINAL | Approved | SITE MATCHES SITE PLAN | |
01/16/2007 | ENGINEERING - FINAL | Not ready for Inspection | Met with super and walked site. | |
01/08/2007 | ENGINEERING - FINAL | Continued | TALKED WITH ARCHITECT REGARDING SITE PLAN HE HAS BEEN AT THE COUNTER AND TALKED TO PATRICIA G ALREADY THERE HAVE BEEN SUBSTANTIAL CHANGES TO ROOF DRAINAGE AT THE NORTH SIDE OF THIS BUILDING THERE IS A DOWNSPOUT THAT IS NOT SCUPPERED AT SIDEWALK ON WEST SIDE OF BUILDING FUTURE PLANS FOR PREVIOUS POOL AREA NEED TO BE ADDRESSED AND WHAT MUST BE COMPLETE BEFORE C OF O NEEDS TO BE CLEARLY DEFINED ALSO SEE MARC'S PARTIAL PUNCHLIST FROM 1/2/07 |
|
01/05/2007 | ENGINEERING - FINAL | Continued | MET ON SITE WITH SCOTT SEE PICS 1909-1915 REITERATED THAT SITE PLAN MUST BE APPROVED THROUGH ENGINEERING BEFORE ANY C OF O APPROVAL |
|
01/02/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Have site plan stamped approved. 2- Install trucated domes for ped. access. (front of building) 3- Install HC ramp per City of Tucson standards. 4- Clean up wash out around building. 5- Seperate all construction activity and material from public access. 6- Remove trash dumpster from site. 7- Stabilize all areas distrubed by construction. 8- Remove port-a-potty from site. CONTRACTOR MAY NEED TO ADDRESS OTHER ITEMS AFTER SITE PLAN IS APPROVED. |