Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* TRENCH DRAINS COMPLETE. OK FOR C OF O PENDING ANY OTHER INSPECTION | |
| 08/30/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) ABS REQUIRES AT LEAST 12" OF COVER 2) VENT FOR INTERCEPTOR TO BE TAKEN OFF ABOVE DRAINAGE CENTER LINE 3) USE APPROVED CONNECTOR BETWEEN DISSIMILAR MATERIALS 4) SHADE PIPE WITH CELAN FILL 5) NO BRIDGING ALLOWED PIPING TO BE LAID ON A FIRM BED 6) OK TO BACKFILL HCS CONNECTION 7) ABOVE CEILING OK TO INSULATE |
|
| 07/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) USE CLEAN FILL AROUND PIPING.OK TO COVER FROM BLDG THRU INTERCEPTOR JUST PAST VENT. NEED TO SEE HCS CONNECTIONS AND REASON FOR WET SOILS |